Within the scope of the “Competition Announcement on the Allocation of Renewable Energy Resource Areas and Connection Capacities Based on Solar Energy” of the Ministry of Energy and Natural Resources of the Republic of Türkiye, 100 MW connection right was obtained for Erzin-1 region in the competition held on 28.06.2022.
Limak Construction carries out leveling and compaction works, construction of site access and on-site roads, design and construction of the site drainage system. The power plant is planned to be opened in 2024.