Amélioration de la jonction de Duhail et des routes d’Al Gharaffa et d’Al Waab

2022
Modernisation des infrastructures routières au Qatar – Intersection de Duhai et de la rue d’Al Gharrafa

Within the scope of the Duhail Junction and Al Gharaffa Road; the improvement of two existing intersections, which includes 3.4 kilometers of new highway, 590 meters of bridges, 152 meters of underpass, 57 kilometers of rain water, treated wastewater and sewer lines, 60 kilometers of electricity lines, 2.2 kilometers of trenchless underground pipe-laying (microtunnel) and 19 thousand square meters of mechanically stabilized masonry works have been realized. In addition, the Al Waab road, which has a total length of 3.8 kilometers, infrastructure lines and 4 intersections have been improved.

The project was completed in September 2022.

Download the project fact sheet

We are using cookies at our website to provide a better web site user experience. By continuing with the default settings you will be accepting use of cookies according to our cookie policy .
Allow
Disable
X
X