This project, which was undertaken by the Limak-Kolin Joint Venture, incorporates 8,836,000 m3 of excavations, 462.000 m3 of concrete works, 694.263 tons of foundation and substratum works, and 320.000 tons of bituminous hot mixture works. The Ankara-Pozantı Highway Eminlik-Çiftehan Section is a 15 km highway section, with 2x3 lanes, that is projected to have two different refuge widths of 5.00 m and 16.50 m. This project includes 15 viaducts with a total length of 2.889 m as well as six tunnels with a total length of 3.734 m.