Uşak Airport Infrastructure Construction

1997
Within the scope of the work, the construction of aviation units such as a runway with dimensions 2.560x30 m, a 125x18 m taxi route and an 80x50 m apron were completed. In this construction, 83.028 m2 of runway concrete pavement was completed, having 30 cm thickness and 95 LNC value.