Balkusan Dam

2012
Balkusan Dam is a power generation dam constructed on a stream with the same name. The body of the dam is RCC filling type and 46 m high from the foundation, the body filling volume is 51.000 cubic meters. The project includes the construction of a 6.305.56 meter-long tunnel, a 5.205-meter-long CTP line, a 3.236-meter-long penstock pipe line, a 6.330-meter-long supply canal, 2 regulators and 2 hydro-electric power plant buildings.