The Banja Bam and HEPP has a clay core, sand-gravel fill body. The body volume is 4.5 million cubic meters. The total height from the foundation is 80 meters and the installed power is 63.4 + 7 MW.
The project, which has been started in July 2013, has been completed in 2016 and has started to generate electricity.