The work includes the construction of a container dock which is 12 m deep, 200 m long, 20,5 m wide and has 11.000 m2 container handling terminal in Derince-Kocaeli. For the construction, 554 Q80 cm piles and 16,300 m3 reinforced concrete was used and 21,.300 m3 dredging was made.