Kaldırım Saltworks Bank no. 1 Construction, Şereflikoçhisar

1982
The project aims to increase the salt production from Tuz Gölü (Salt Lake). 460.000 m3 of excavation we performed and 7.5 km-long inner lake bank and 1.5 km-long coast protection bank was constructed with 300.000 m3 of fill material and 150.000 tons of rock borrowed from the pit. A 32 m-long bridge to be used as a spillway was also completed in this project.