Dalaman Air Supply Directorship Upgrade Station Pipeline, Muğla

1991

A ship terminal to which ships can come alongside, 360 m long undersea pipeline with 10" diameter, 6 km long pipeline with a diameter of 10", pumping station, and 1,250 m NATO type reinforced steel fuel tank and a drainage tank was completed. The cathodic protection of the system was also performed within the scope of the project.