East-West 1980-1981 Pipeline Repair Works

1983
2.1 km of fuel pipes with a diameter of 4"-6"-8" which are tested under a high pressure of 95 ATM were laid and their cathoid protection was performed. Besides, river crossings at seven locations and their rock filling was completed within the scope of this project.
We are using cookies at our website to provide a better web site user experience. By continuing with the default settings you will be accepting use of cookies according to our cookie policy .
Allow
Disable
X
X