Situated on the Peri stream, the Pembelik Dam and Hydroelectric Power Plant (HEPP) began operations in 2015. A gravity dam with an installed capacity of 130 MW, the plant has an annual average power generation capacity of 410 million kWh. In line with the International Carbon Standards, the plant is in possession of the Carbon Emission Reduction and Social Carbon Validation certificates.
The production amount in 2023 was 348,834,724 kWh.