Situated on Peri stream, Seyrantepe Dam and Hydroelectric Power Plant (HEPP) was established in 2008. With a total installed power of 59 MW, the plant possesses an impressive annual average generation capacity of 180 million kWh.
The production amount in 2023 was 153,519,646 kWh.