Situated on the Munzur stream, the Uzunçayır Dam and Hydroelectric Power Plant (HEPP) has been in operation since 2009. With a total installed power of 84 MW, the plant possesses an annual average generation capacity of 322 million kWh. The production amount in 2023 was 323,019,264 kWh. The plant is positioned as the largest power plant in Tunceli and is equipped with high technology that has the capacity to meet the annual electricity requirement of Tunceli province.
In line with Limak Energy’s commitment towards environmental sustainability, the Uzunçayır Dam and HEPP attained a Carbon Emission Reduction Certificate and Social Carbon Validation Certificate in 2011. In March 2012, the plant introduced its first 250,000 tons of verified carbon emission reduction into voluntary markets.